Mazda 626

1991-1998 of release

Repair and operation of the car



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   - 3.1. Petrol engines (1,6 and 1,8 liters)
      3.1.1. Introduction
      3.1.2. Technical characteristics
      3.1.3. Recommendations about repair
      3.1.4. Top dead point
      3.1.5. Cover of valves
      3.1.6. Inlet collector
      3.1.7. Final collector
      3.1.8. Gas-distributing belt and asterisks
      3.1.9. Camshaft epiploons
      3.1.10. Yokes and distributive shaft
      3.1.11. Springs of valves, fastenings and laying
      3.1.12. Head of cylinders
      3.1.13. Oil pallet
      3.1.14. Forward cover
      3.1.15. Oil pump
      3.1.16. Forward epiploon of a bent shaft
      3.1.17. Flywheel
      3.1.18. Back epiploon of a bent shaft
      3.1.19. Fastenings of the engine
   + 3.2. Petrol 4-cylinder engine (2 liters)
   + 3.3. Petrol V6 engine (2,5 liters)
   + 3.4. Partition of engines (1,6 and 1,8 liters)
   + 3.5. Partition of engines (2,0 and 2,5 liters of V6)
   + 3.6. Diesel engine 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and half shafts
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electrical circuitries
+ 14. Useful tips


4295d568



3.1.7. Final collector

Removal

PERFORMANCE ORDER
1. Disconnect a wire of the minus plug of the accumulator.
2. Disconnect a wire of the oxygen sensor, remove the sensor if you establish a new collector.
3. Unscrew bolts of the heat-insulating screen and remove the screen.
4. Lift and fix a forward part of the car.
5. Disconnect an exhaust pipe from a collector and lower the car.
6. Unscrew bolts of a collector and remove a collector.

Installation

PERFORMANCE ORDER
1. Clean the joined surfaces of a collector and a head of cylinders. If laying of a collector escaped, address experts.
2. Establish new laying.
3. Establish a collector and insert bolts.
4. Tighten bolts and establish the remained details.
5. Check operation of the engine.