Mazda 626

1991-1998 of release

Repair and operation of the car



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   - 3.1. Petrol engines (1,6 and 1,8 liters)
      3.1.1. Introduction
      3.1.2. Technical characteristics
      3.1.3. Recommendations about repair
      3.1.4. Top dead point
      3.1.5. Cover of valves
      3.1.6. Inlet collector
      3.1.7. Final collector
      3.1.8. Gas-distributing belt and asterisks
      3.1.9. Camshaft epiploons
      3.1.10. Yokes and distributive shaft
      3.1.11. Springs of valves, fastenings and laying
      3.1.12. Head of cylinders
      3.1.13. Oil pallet
      3.1.14. Forward cover
      3.1.15. Oil pump
      3.1.16. Forward epiploon of a bent shaft
      3.1.17. Flywheel
      3.1.18. Back epiploon of a bent shaft
      3.1.19. Fastenings of the engine
   + 3.2. Petrol 4-cylinder engine (2 liters)
   + 3.3. Petrol V6 engine (2,5 liters)
   + 3.4. Partition of engines (1,6 and 1,8 liters)
   + 3.5. Partition of engines (2,0 and 2,5 liters of V6)
   + 3.6. Diesel engine 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and half shafts
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electrical circuitries
+ 14. Useful tips


4295d568



3.1.19. Fastenings of the engine

GENERAL INFORMATION

Prevention

During check the engine needs to be raised slightly to transfer its weight from support to the elevator.


Right support of the engine

1. Through bolt of a support

2. Dynamic damper of a support

3. Support arm nuts

Check

PERFORMANCE ORDER
1. Check rubber shock-absorbers of support for existence of cracks and damages.
2. Move support the big screw-driver if support are loosened, delay their fastenings.

Replacement

PERFORMANCE ORDER
Support (N1 and N2) of the engine and transmission
1. Twist the support nuts fixing it to a cross-piece.
2. Unscrew through bolts and remove a support from an arm.
3. Unscrew bolts of a cross-piece and remove a cross-piece.
4. Establish a new support on an arm and tighten bolts.
Right support (N3) of the engine
5. Unscrew and remove a through bolt of a support.
6. Remove a dynamic damper from a support.
7. Twist nuts of an arm of a support and remove a support.
8. Establish a new support, insert and tighten a bolt and nuts.
Left support (N4) of the engine
9. Remove the accumulator and fastening of the accumulator.
10. Unscrew bolts and nuts of an arm of a support.
11. Unscrew support bolts.
12. Remove a support.
13. Establish a new support.