Mazda 626

1991-1998 of release

Repair and operation of the car



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. Petrol engines (1,6 and 1,8 liters)
   + 3.2. Petrol 4-cylinder engine (2 liters)
   + 3.3. Petrol V6 engine (2,5 liters)
   + 3.4. Partition of engines (1,6 and 1,8 liters)
   - 3.5. Partition of engines (2,0 and 2,5 liters of V6)
      3.5.1. Introduction
      + 3.5.2. Technical characteristics
      3.5.3. Repair work without dismantle of the engine from the car
      + 3.5.4. Capital repairs of the engine
      3.5.5. Check by means of the vacuum measuring instrument
      3.5.6. Check of a compression
      3.5.7. Methods of dismantle of the engine
      3.5.8. Removal and installation of the engine
      3.5.9. Engine partition
      3.5.10. Partition and check of a head of cylinders
      3.5.11. Valves
      3.5.12. Assembly of a head of cylinders
      3.5.13. Removal of pistons and rods
      3.5.14. Removal of a bent shaft
      3.5.15. Check of the block of cylinders
      3.5.16. Honingovaniye of cylinders
      3.5.17. Check of pistons and rods
      3.5.18. Check of a bent shaft
      3.5.19. Check and selection of radical bearings and bearings of rods
      3.5.20. Check of camshafts and pushers
      3.5.21. Engine assembly order
      3.5.22. Installation of piston rings
      3.5.23. Installation of a bent shaft
      3.5.24. Installation of a back epiploon of a bent shaft
      3.5.25. Installation of pistons and rods
   + 3.6. Diesel engine 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and half shafts
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electrical circuitries
+ 14. Useful tips


4295d568



3.5.25. Installation of pistons and rods

GENERAL INFORMATION

Arrangement of trailer gaps of the bearing

1. Forward part of the engine

2. Top part of the piston

A. Gap of the top compression ring

B. Gap of the second compression ring

C. Gaps of oil scraper rings

D. Gap of a broad ring

Check of a lubricant gap of conrod bearings

PERFORMANCE ORDER
1. Clean the top insert of the bearing of a rod and establish it on a rod. Lubricant openings of a rod and an insert have to be combined.
2. Clean the second insert and establish it in a rod cover.
3. Arrange trailer gaps of piston rings as shown in the drawing.
4. Grease pistons and rings and squeeze piston rings by means of the compressor of piston rings.
5. Turn a bent shaft so that the conrod bearing of the first cylinder was in the family way of the lower dead point, and grease cylinder walls.
6. Check that the mark from above of the piston was turned forward.
7. Press on the piston and install it in the cylinder.
8. For measurement of a lubricant gap it is possible to use an internal micrometer or other special device, but the most exact and easy method it - to use the special plastic measuring instrument.
9. After installation of the piston in the cylinder, tighten bolts of covers of rods, and check a lubricant gap of the conrod bearing. Put plastic pieces on each of bearings of rods parallel to an axis of a bent shaft.
10. Compare width of the crushed film to a special scale.
11. If the size of a gap do not correspond demanded probably inserts of the wrong size are established.

Final installation of pistons and rods

PERFORMANCE ORDER
1. Remove all traces of plastic. Check that the surface of inserts was absolutely pure, and oil them engine.
2. Establish a rod on a shaft neck, establish a cover of a rod and tighten nuts till the required inhaling moment.
3. Installation of other rods is carried out similarly.
4. After installation of all rods turn a bent shaft several times and check ease of the course.
5. Check an axial side play of rods.

On the homepage