Mazda 626

1991-1998 of release

Repair and operation of the car



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. Petrol engines (1,6 and 1,8 liters)
   + 3.2. Petrol 4-cylinder engine (2 liters)
   + 3.3. Petrol V6 engine (2,5 liters)
   + 3.4. Partition of engines (1,6 and 1,8 liters)
   - 3.5. Partition of engines (2,0 and 2,5 liters of V6)
      3.5.1. Introduction
      + 3.5.2. Technical characteristics
      3.5.3. Repair work without dismantle of the engine from the car
      + 3.5.4. Capital repairs of the engine
      3.5.5. Check by means of the vacuum measuring instrument
      3.5.6. Check of a compression
      3.5.7. Methods of dismantle of the engine
      3.5.8. Removal and installation of the engine
      3.5.9. Engine partition
      3.5.10. Partition and check of a head of cylinders
      3.5.11. Valves
      3.5.12. Assembly of a head of cylinders
      3.5.13. Removal of pistons and rods
      3.5.14. Removal of a bent shaft
      3.5.15. Check of the block of cylinders
      3.5.16. Honingovaniye of cylinders
      3.5.17. Check of pistons and rods
      3.5.18. Check of a bent shaft
      3.5.19. Check and selection of radical bearings and bearings of rods
      3.5.20. Check of camshafts and pushers
      3.5.21. Engine assembly order
      3.5.22. Installation of piston rings
      3.5.23. Installation of a bent shaft
      3.5.24. Installation of a back epiploon of a bent shaft
      3.5.25. Installation of pistons and rods
   + 3.6. Diesel engine 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and half shafts
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electrical circuitries
+ 14. Useful tips


4295d568



3.5.22. Installation of piston rings

PERFORMANCE ORDER
1. Before installation it is necessary to check trailer and side gaps of piston rings.
2. Install the top compression ring in the cylinder by means of the piston.
3. Measure a trailer gap of a ring. If a gap too small, you can replace piston rings or increase a gap, having ground the ends of a piston ring a small file.
4. Carry out the similar procedure with all rings.
5. After check and adjustment of a trailer gap, a ring it is possible to install on pistons.
6. The oil scraper ring is established by the first. At first establish a broad ring in a flute, then establish the lower and top oil scraper rings.
7. After installation of all elements of an oil scraper ring check that the top and lower rings rotated freely.
8. Establish the second compression ring by means of the special tool by a mark up.
9. Then establish the top compression ring.
10. Do similar procedures with the remained pistons.