Mazda 626

1991-1998 of release

Repair and operation of the car



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. Petrol engines (1,6 and 1,8 liters)
   + 3.2. Petrol 4-cylinder engine (2 liters)
   + 3.3. Petrol V6 engine (2,5 liters)
   + 3.4. Partition of engines (1,6 and 1,8 liters)
   - 3.5. Partition of engines (2,0 and 2,5 liters of V6)
      3.5.1. Introduction
      + 3.5.2. Technical characteristics
      3.5.3. Repair work without dismantle of the engine from the car
      + 3.5.4. Capital repairs of the engine
      3.5.5. Check by means of the vacuum measuring instrument
      3.5.6. Check of a compression
      3.5.7. Methods of dismantle of the engine
      3.5.8. Removal and installation of the engine
      3.5.9. Engine partition
      3.5.10. Partition and check of a head of cylinders
      3.5.11. Valves
      3.5.12. Assembly of a head of cylinders
      3.5.13. Removal of pistons and rods
      3.5.14. Removal of a bent shaft
      3.5.15. Check of the block of cylinders
      3.5.16. Honingovaniye of cylinders
      3.5.17. Check of pistons and rods
      3.5.18. Check of a bent shaft
      3.5.19. Check and selection of radical bearings and bearings of rods
      3.5.20. Check of camshafts and pushers
      3.5.21. Engine assembly order
      3.5.22. Installation of piston rings
      3.5.23. Installation of a bent shaft
      3.5.24. Installation of a back epiploon of a bent shaft
      3.5.25. Installation of pistons and rods
   + 3.6. Diesel engine 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and half shafts
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electrical circuitries
+ 14. Useful tips


4295d568



3.5.20. Check of camshafts and pushers

Camshafts

PERFORMANCE ORDER
1. To measure a beating of camshafts, address the expert.
2. Examine necks of bearings of shaft on existence of scratches and wear tracks. If shaft are worn-out, replace them together with a head of cylinders. Measure diameters of necks of bearings.
3. Examine cams of shaft on wear existence. By means of a micrometer measure height of cams. If the size of wear of a cam exceeds admissible limits, replace the camshaft.
4. Measure lubricant gaps of bearings of camshafts by means of the plastic measuring instrument. If the size of a gap exceeds admissible limits, replace the camshaft and carry out a repeated inspection. If the result remained the same, replace a head of cylinders.
5. Determine width of the crushed plastic strip by the special table.

Pushers

PERFORMANCE ORDER
1. Examine surfaces of pushers on existence of wear, scratches and traces of an overheat. If one or several pushers are damaged, it is necessary to replace all pushers.
2. Measure external diameters of pushers and internal diameters of the openings corresponding to them in a head. Take away diameter of a pusher from diameter of an opening, and you receive the size of a lubricant gap. Calculate gaps of all pushers and compare them to technical requirements. If gaps of pushers exceed admissible limits, replace pushers or a head.