Mazda 626

1991-1998 of release

Repair and operation of the car



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. Petrol engines (1,6 and 1,8 liters)
   + 3.2. Petrol 4-cylinder engine (2 liters)
   + 3.3. Petrol V6 engine (2,5 liters)
   - 3.4. Partition of engines (1,6 and 1,8 liters)
      3.4.1. Introduction
      3.4.2. Technical characteristics
      3.4.3. Repair work without dismantle of the engine from the car
      + 3.4.4. Capital repairs of the engine
      3.4.5. Checks of the engine
      3.4.6. Removal and installation of the engine
      3.4.7. Preparation for a partition
      3.4.8. Engine partition
      3.4.9. Partition and check of a head of cylinders
      3.4.10. Repair of valves
      3.4.11. Assembly of a head of cylinders
      3.4.12. Removal of pistons and rods
      3.4.13. Removal of a bent shaft
      3.4.14. Check and cleaning of the block of cylinders
      3.4.15. Honingovaniye of cylinders
      3.4.16. Check of pistons and rods
      3.4.17. Check of a bent shaft
      3.4.18. Check of radical bearings and bearings of rods
      3.4.19. Engine assembly order
      3.4.20. Installation of piston rings
      3.4.21. Installation of a bent shaft
      3.4.22. Installation of a back epiploon of a bent shaft
      3.4.23. Installation of pistons and rods
      3.4.24. Launch of the engine after repair and a running in
   + 3.5. Partition of engines (2,0 and 2,5 liters of V6)
   + 3.6. Diesel engine 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and half shafts
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electrical circuitries
+ 14. Useful tips


4295d568



3.4.22. Installation of a back epiploon of a bent shaft

PERFORMANCE ORDER
1. Beat out an old epiploon from a casing.
2. Oil slightly external surface of an epiploon assembly or oil for the engine, establish an epiploon in boring of a back cover.
3. By means of a mandrel evenly press an epiploon before full landing. Epiploon sponges at installation have to be turned inside.
4. Apply on laying and on contact surfaces of a back cover a sealant layer.
5. Oil slightly working edge of an epiploon, establish into place laying and screw bolts. Tighten bolts with the set moment.
6. Accurately cut off the part of laying supporting dimensions of a back cover which comes on the privalochny plane of the oil pallet.