Mazda 626

1991-1998 of release

Repair and operation of the car



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. Petrol engines (1,6 and 1,8 liters)
   + 3.2. Petrol 4-cylinder engine (2 liters)
   - 3.3. Petrol V6 engine (2,5 liters)
      3.3.1. Introduction
      3.3.2. Technical characteristics
      3.3.3. Recommendations about repair
      3.3.4. Top dead point of the first piston
      3.3.5. Covers of heads of cylinders
      3.3.6. Springs, clamps and epiploons of valves
      3.3.7. Gas-distributing belt and asterisks
      3.3.8. Camshafts and pushers
      3.3.9. Inlet collector
      3.3.10. Final collectors
      3.3.11. Heads of cylinders
      3.3.12. Forward epiploon of a bent shaft
      3.3.13. Oil pallet
      3.3.14. Oil pump
      3.3.15. Flywheel or drive plate
      3.3.16. Back epiploon of a bent shaft
      3.3.17. Fastenings of the engine
   + 3.4. Partition of engines (1,6 and 1,8 liters)
   + 3.5. Partition of engines (2,0 and 2,5 liters of V6)
   + 3.6. Diesel engine 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and half shafts
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electrical circuitries
+ 14. Useful tips


4295d568



3.3.11. Heads of cylinders

Removal

PERFORMANCE ORDER
1. Disconnect a wire of the minus plug of the accumulator.
2. Merge cooling liquid. Disconnect the top hose of a radiator from a branch pipe.
3. Remove airintaking branch pipes and the air filter. Remove an inlet collector.
4. Remove final collectors.
5. Remove the generator. Disconnect wires from spark plugs. Remove the breaker the distributor of ignition and the coil of ignition.
6. Take off a gas-distributing belt, asterisks of camshafts, a natyazhitel of a gas-distributing belt and intermediate pulleys.
7. Remove camshafts and pushers of valves.
6. Unscrew bolts and remove a back cover of a gas-distributing belt.
7. Remove branch pipes of cooling liquid from heads of cylinders.
8. Unscrew bolts and disconnect plaits of wires from back parts of heads.
9. Using the sequence, the return sequence of tightening, weaken in several approaches (on 1/4 turns) bolts of heads of cylinders. Prepare new bolts.
10. Remove heads of cylinders.

Installation

PERFORMANCE ORDER
1. Carefully clean and wipe with solvent or acetone the joined surfaces of heads and blocks of cylinders.
2. Examine the joined surfaces on existence of cracks, deep scratches and other damages. At detection of above-mentioned damages the head needs to be processed in a specialized workshop.
3. Clean openings of bolts of heads by means of suitable taps.
4. Establish new laying of heads.
5. Establish heads of cylinders.
6. Grease carvings of new bolts with a small amount of oil. Insert bolts and tighten them in the specified sequence, using the instructions given in subsection 3.3.2.
7. Establish the remained details in the return sequence.

On the homepage